The retention calculation is determined by the Retention Code attached to the Contract or Subcontract.
Four methods are supported as described below.
- Step by Value – Contracts and Subcontracts
- Step by Percent (Estimate Type) – Contracts and Subcontracts
- Step by Percent (Sched Type) – Contracts Only
- Back to Back with Subcontracts