Work Centre's are required on and populated from:

QUOTE SCHEDULE LINE

  • When the Schedule is imported the Work Centre comes from the Import File (if populated), Otherwise it is the Work Centre on the Activity Code in the Control Parameter 'Quote Default Activity Code'.
  • When the Schedule is manually entered, the Work Centre comes from the Cost Sheet Header (if populated), otherwise it has to be manually entered.

QUOTE SCHEDULE LINE DETAIL

  • When imported from BOM

The Work Centre comes (in order of priority), from the Work Centre on the BOM (if populated), Otherwise the Cost Sheet Header (if populated), Otherwise the default on the chosen Activity or the Work Centre drop down.

  • When it is manually entered from the Work Centre on the Schedule Line, where the Cost Sheet Header has 'Default Parent Work Centre on Schedules' ticked, Otherwise the default on the chosen Activity or the Work Centre drop down.

CONTRACT SCHEDULE LINES

  • When the Contract Schedule is imported from the Quote Schedule, The Work Centre on the Quote Schedule Line is populated on the Contract Schedule Line.