Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

This tab provides the fields for drawing revision maintenance. Double clicking on the record selector of each item opens the Drawings Links screen.

Job Code
Enter a valid Job Code or use the <F4> job search function. Job Codes may be entered manually.

Rev
Enter a drawing revision.

Date
Enter a drawing revision date or double click to use the calendar.

By
Enter a drawing revision by name or use the <F4> Find People function.

Revision Note
Enter a drawing revision note.

Checked By
Enter a drawing revision checked by name or use the <F4> Find People function.

Checked By: Date
Enter a drawing revision checked by date or double click to use the calendar.

Approved By
Enter a drawing revision approved by name or use the <F4> Find People function.

Approved By: Date
Enter a drawing revision approved by date or double click to use the calendar.

Scale
Select a drawing scale from the list.

Type
Select a drawing content type from the list.

Size
Select a drawing size from the list.

Media
Select a drawing media from the list.

Status
Select a drawing status from the list.

Storage Ref
Enter a physical drawing storage reference.

Detail
Enter a drawing detail.

File Path, Drawing File, Image File
Click the yellow open folder buttons to navigate to the drawing and/or image file(s). Click the view buttons to view the relative file.

Transmittal Number
Enter a received transmittal number for the drawing.

Receipt Date
Enter a received transmittal date for the drawing or double click to use the calendar.

Receipt Details
Enter received transmittal details for this drawing.

  • No labels