Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

The processing is achieved through a range of sequence numbers. The allocation with the higher sequence number will take priority and can feed into a job which will in turn allocate to another job.

...

Image Removed

E.g.:

  • Seq 1 (Red): Telephones to Hamilton (10%), Corporate 1 (40%), Corporate 2 (25%),Corporate 3 (25%).
  • Seq 1 (Orange): Motor Vehicles to Auckland (4), Corporate 1 (2), Corporate 2 (1), Corporate 3 (1).
  • Seq 2 (Green): Corporate 1 to Hamilton (10), Te Rapa (11), Cambridge (10), Auckland (5)
  • Seq 2 (Purple): Corporate 2 to Hamilton (40%), Auckland (40%), Corporate 3 (20%)
  • Seq 3 (Blue): Corporate 3 to Te Rapa (2), Cambridge (10), Auckland (50)

The processing is done by selecting the sequence not the specific Allocation. If you want to maintain control over the timing of every allocation you will need to set up each Allocation as a separate Sequence.