On the Standard Outputs tab in Job Maintenance, set up the required Standard Outputs for this Job based on the Schedules available. The Rate on each Output Code will default from the Schedule, but can be overridden.
Generate Standard Outputs
Standard Outputs can be set up on the Job Masterfile as described.
...