...
E.g.:
- Seq 1 (Red): Telephones to Hamilton (10%), Corporate 1 (40%), Corporate 2 (25%),Corporate 3 (25%).
- Seq 1 (Orange): Motor Vehiclesto Auckland (4), Corporate 1 (2), Corporate 2 (1), Corporate 3 (1).
- Seq 2 (Green): Corporate 1 to Hamilton (10), Te Rapa (11), Cambridge (10), Auckland (5)
- Seq 2 (Purple): Corporate 2to Hamilton (40%), Auckland (40%), Corporate 3 (20%)
- Seq 3 (Blue): Corporate 3to Te Rapa (2), Cambridge (10), Auckland (50)
The processing is done by selecting the sequence not the specific Allocation. If you want to maintain control over the timing of every allocation you will need to set up each Allocation as a separate Sequence.