The Excel spreadsheet needs 14 Columns to bring in the data required.

 

Item Code

Item Description

Unit

Activity Code

Work Centre

Cost Sheet Code

Cost Sheet Description

Header

Cost Rate

Sell Rate

No Of Units

Unit Length

Quantity

Line Type

 

1

Establishment

LS

 

 

050

Preliminary and General

 

 

 

 

 

1

S

 

2

Permits and Fees

LS

 

 

050

Preliminary and General

 

 

 

 

 

1

S

 

3

Insurance

LS

 

 

050

Preliminary and General

 

 

 

 

 

1

S

 

4

Maintenance

LS

 

 

050

Preliminary and General

 

 

 

 

 

1

S

 

5

Setting out of Works by Planscaps Ltd.

PS

 

 

050

Preliminary and General

 

 

 

 

 

1

S

 

101

Install and Maintain all Temporary and Interim silt/erosion control measures within Earthworks areas.

LS

 

 

100

Earthworks

 

 

 

 

 

1

S

 

102

To strip topsoil to temporary stockpile

m3

 

 

100

Earthworks

 

 

 

 

 

1850

S

 

103

To strip topsoil to waste off site

m3

 

 

100

Earthworks

 

 

 

 

 

500

S

 

104

To cut unsuitable material to waste off site

m3

 

 

100

Earthworks

 

 

 

 

 

1000

S

 

105

To cut the fill of unsuitable material on site. Includes realigned creeks, sections, road and right of way.

m3

 

 

100

Earthworks

 

 

 

 

 

2000

S

 

106

Structural filling (place and compact to NZS 4431

 

 

 

100

Earthworks

Yes

 

 

 

 

0

S

 

106 1

a) To cut to fill on road line, rights of way and section areas

m3

 

 

100

Earthworks

106

 

 

 

 

500

S

 

200

Allow to construct standard kerb and channelling and concrete nib to road and rights of way

 

 

 

200

Kerb & Channel

Yes

 

 

 

 

0

S

 

200 1

Rate to include supply and construction of all materials, preparation of the base with 50mm compacted AP20 basecourse, installation of brass plaques and kerb cut downs.

 

 

 

200

Kerb & channel

200

 

 

 

 

0

S

 

201

Standard kerb and channel

 

 

 

200

Kerb & Channel

Yes

 

 

 

 

0

S

 

201.1

a) Marsden Valley Road

m

 

 

200

Kerb & Channel

201

 

 

 

 

206

S

 

201.2

b) Culdesac & ROW

m

 

 

200

Kerb & Channel

201

 

 

 

 

207

S

 

202

150 x 225 Concrete Nib

m

 

 

200

Kerb & Channel

 

 

 

 

 

194

S

 

211

Basecourse - Culdesac & ROW A

 

 

 

210

Road and Pavement

Yes

 

 

 

 

0

S

 

211.1

a) Allow to supply, place and compact AP40 basecourse to carriageway and to test preseal surface with benkleman beam

m3

 

 

210

Road Pavement

211

 

 

 

 

148

S

 

211.2

b) Allow to supply, place and compact AP65 basecourse to carriageway

m3

 

 

210

Road Pavement

211

 

 

 

 

160

S

...