Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

On entering the Generate Job Allocations screen you need to Calculate before you can Post. The Post Batch is greyed out otherwise.

Batch
You can select an existing Job adjustment batch or create a new batch header for these transactions.

Please Note:
The batch will need to be the same period as the Period of the YTD value. This is the same Year/Period of the System Control File and is the highlighted Year/Period on the Generate Cost Allocations screen.

Post Batch
Creates the batch of allocation transactions. To edit or delete these transactions recall this batch using Enter Job Adjustments.
This is the error message where a Job is 'Finalised' that you want to allocate to.

List Batch will print a Batch Edit List