Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

Image Added

This tab provides the fields for drawing revision maintenance. Double clicking on the record selector of each item opens the Drawings Links screen.

Job Code
Enter a valid Job Code or use the <F4> job search function. Job Codes may be entered manually.

Rev
Enter a drawing revision.

Date
Enter a drawing revision date or double click to use the calendar.

By
Enter a drawing revision by name or use the <F4> Find People function.

Revision Note
Enter a drawing revision note.

Checked By
Enter a drawing revision checked by name or use the <F4> Find People function.

Checked By: Date
Enter a drawing revision checked by date or double click to use the calendar.

Approved By
Enter a drawing revision approved by name or use the <F4> Find People function.

Approved By: Date
Enter a drawing revision approved by date or double click to use the calendar.

Scale
Select a drawing scale from the list.

Type
Select a drawing content type from the list.

Size
Select a drawing size from the list.

Media
Select a drawing media from the list.

Status
Select a drawing status from the list.

Storage Ref
Enter a physical drawing storage reference.

Detail
Enter a drawing detail.

File Path, Drawing File, Image File
Click the yellow open folder buttons to navigate to the drawing and/or image file(s). Click the view buttons to view the relative file.

Transmittal Number
Enter a received transmittal number for the drawing.

Receipt Date
Enter a received transmittal date for the drawing or double click to use the calendar.

Receipt Details
Enter received transmittal details for this drawing.