The Excel spreadsheet needs 14 Columns to bring in the data required.
| Item Code | Item Description | Unit | Activity Code | Work Centre | Cost Sheet Code | Cost Sheet Description | Header | Cost Rate | Sell Rate | No Of Units | Unit Length | Quantity | Line Type |
| 1 | Establishment | LS |
|
| 050 | Preliminary and General |
|
|
|
|
| 1 | S |
| 2 | Permits and Fees | LS |
|
| 050 | Preliminary and General |
|
|
|
|
| 1 | S |
| 3 | Insurance | LS |
|
| 050 | Preliminary and General |
|
|
|
|
| 1 | S |
| 4 | Maintenance | LS |
|
| 050 | Preliminary and General |
|
|
|
|
| 1 | S |
| 5 | Setting out of Works by Planscaps Ltd. | PS |
|
| 050 | Preliminary and General |
|
|
|
|
| 1 | S |
| 101 | Install and Maintain all Temporary and Interim silt/erosion control measures within Earthworks areas. | LS |
|
| 100 | Earthworks |
|
|
|
|
| 1 | S |
| 102 | To strip topsoil to temporary stockpile | m3 |
|
| 100 | Earthworks |
|
|
|
|
| 1850 | S |
| 103 | To strip topsoil to waste off site | m3 |
|
| 100 | Earthworks |
|
|
|
|
| 500 | S |
| 104 | To cut unsuitable material to waste off site | m3 |
|
| 100 | Earthworks |
|
|
|
|
| 1000 | S |
| 105 | To cut the fill of unsuitable material on site. Includes realigned creeks, sections, road and right of way. | m3 |
|
| 100 | Earthworks |
|
|
|
|
| 2000 | S |
| 106 | Structural filling (place and compact to NZS 4431 |
|
|
| 100 | Earthworks | Yes |
|
|
|
| 0 | S |
| 106 1 | a) To cut to fill on road line, rights of way and section areas | m3 |
|
| 100 | Earthworks | 106 |
|
|
|
| 500 | S |
| 200 | Allow to construct standard kerb and channelling and concrete nib to road and rights of way |
|
|
| 200 | Kerb & Channel | Yes |
|
|
|
| 0 | S |
| 200 1 | Rate to include supply and construction of all materials, preparation of the base with 50mm compacted AP20 basecourse, installation of brass plaques and kerb cut downs. |
|
|
| 200 | Kerb & channel | 200 |
|
|
|
| 0 | S |
| 201 | Standard kerb and channel |
|
|
| 200 | Kerb & Channel | Yes |
|
|
|
| 0 | S |
| 201.1 | a) Marsden Valley Road | m |
|
| 200 | Kerb & Channel | 201 |
|
|
|
| 206 | S |
| 201.2 | b) Culdesac & ROW | m |
|
| 200 | Kerb & Channel | 201 |
|
|
|
| 207 | S |
| 202 | 150 x 225 Concrete Nib | m |
|
| 200 | Kerb & Channel |
|
|
|
|
| 194 | S |
| 211 | Basecourse - Culdesac & ROW A |
|
|
| 210 | Road and Pavement | Yes |
|
|
|
| 0 | S |
| 211.1 | a) Allow to supply, place and compact AP40 basecourse to carriageway and to test preseal surface with benkleman beam | m3 |
|
| 210 | Road Pavement | 211 |
|
|
|
| 148 | S |
| 211.2 | b) Allow to supply, place and compact AP65 basecourse to carriageway | m3 |
|
| 210 | Road Pavement | 211 |
|
|
|
| 160 | S |
...